Central operation board | |
Main line | |
New line | |
Alps line | |
Underground line | |
Turntable | |
Central operation board of my own making is shown. Each point is changed when corresponding point of contact is turned on electricity.Wiring is so much complicated. Komai Railway equips two boards. | |
![]() |
|
Long formation ot kiha82 limited express diesel cars goes round the main line. To see a running video, click the lower picture. | Long formation ot 486 type Raichou limited express electric cars crosses X formation cross line. To see a running video, click the lower picture.. |
![]() |
![]() |
Four lanes tracks of west side and central main lines. You can see a traverser at lower right. |
|
![]() |
|
Six siding yards are set in a main line. Sidetrack 1 in a main line. |
|
![]() |
|
Sidetrack 2 in a main line. |
|
![]() |
|
Sidetrack 3 in a main line. |
|
![]() |
|
Sidetrack 4 in a main line. |
|
![]() |
|
Sidetrack 5 in a main line. |
|
![]() |
|
Sidetrack 6 in a main line. |
|
![]() |
|
Two siding yards are set in a new line. Sidetrack 1 in a new line. |
|
![]() |
|
Sidetrack 2 in a new line. | |
![]() |
|
Three sidetracks are set in Alps line. The slope from ground to highland lines is 60 ‰. Sidetrack 1 in Alps line. |
|
![]() |
|
Sidetrack 2 in Alps line. | |
![]() |
|
Sidetrack 3 in Alps line. | |
![]() |
|
Underground sidetrack consists of 8 lines, and long formation trains can wait. The slope from ground to underground lines is 60 ‰. Double locomotive formation is needed to pull the long trains. |
|
![]() |
|
Fan shaped shed and turntable with 27 lines. | |
![]() |
|
![]() ![]() |